Customization: | Available |
---|---|
After-sales Service: | 1year |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
CIP System Recovery Rock Gold Tailing Process Plant Machine Mobile CIL |
In addition to separate gold, the process can also be used for flotation of copper ore,
lead and zinc ore, hematite ore, tin ore,graphite ore, tungsten ore and other metals and non-metal ore.
Timesaver in the leaching process, thus reducing the production expenditure.
Besides, advanced extraction technology improving the efficiency of gold extraction.
This complete CIP gold process plant includes a feeding machine, jaw crushers, fine jaw crusher, belt conveyor,
vibration screen,ball mill, thickener, leaching & adsorption agitation tanks, desorption electrolysis system,
tailing water recycle system,and all the other needed accessories.
Crushing and Grinding system:
In Gold CIP/CIL plant, to achieve high recovery rate, usually adopts double ball mill, one is grid type,
one is overflowed type,the grinding size will be 90%-200 mesh.
Leaching System:
Fter the ore pulp adding cyanide, it will be pumped to leaching tank, usually we adopts 8 leaching tanks,
installed in stair-stepping, the toppest two is preleaching tank, will add actived carbon from lowest one,
then use carbon lifting pump and carbon screen to lift the gold carried carbon one by one till highest.
After leaching, gold mud in grade about 30-40% will feed
into electrolysis machine or melting furnace to separate gold and carbon, after this step, the carbon can
be recycled by acid and water washing tank. At last the gold grade will be at 98% above.
Thickening Syetem:
After ball mill grinding, the ore pulp will be feed into thickner to dewater to achieve proper density to go
next step leaching.
Under the thickner, there is enough space to build several warehouse and install a chemical mix tank.
Gongyi Hengchang Metallurgical Building Materials Equipment Factory is located in Zhengzhou, Henan Province, China,
specializing in the research and development, manufacturing, and sales services of mining equipment.
Q:If I don't know how to operate this machine? How can I do?
A:Our machine has been tested OK and fully assembled before shipping,
customer just needs to make2~4 hours wear-in and then can work.