Copper ore Flotation machine For Lead beneficiation plant From Flotation machine manufacturer
We can supply a complete line for separating mineral ore machine:
Mining related machines and working principle:
Process descripition:
Crushing System
The rocks are crushed to the qualified particle size for grinding. The module is composed of hoppers, crushers, belt conveyors,feeders and so on.The ores are usually crushed in two stages. According to the actual situation of the site, the primary crusher can be mounted in the mining area or the processing plant. The crusher is usually driven by a diesel engine if it is located in the mining area.
Grinding System:
After crushing, some minerla is still difficult to dress, the size is still not standard for separation, so need to be milled by milling machine, usually ball mill is more widely, also can choose roller wheel mill according to the situation.
Flotation Process:
Leaching Process:
Thickener:
Plant site Applation cases:
Packinging, Shipping And Service
1) Installation and guidance
When the machine arrives at your company, we will dispatch our technicians to your company to guide the installation and commissioning at site. User should pay for the following fees air tickets, boarding and lodging and traffic in client's factory.
(2)Technical training
We provide free technical training service to your stuff. Training content contains the main work principle of machine, operating regulations, maintenance methods and steps, safety, etc.
(3)Warranty:
Three guarantees of our product quality, warranty for one year (not include man-made damaged). We will maintain the machine for free for the quality problem. If the damage is caused by your improperly operation, the cost of the maintenance burden by you. we also provide you the life-long follow-up service.
FAQ:
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: 30% advanced payment by T/T, balance paid before shipment.
Why Choose Us?
1.We are true Manufacturer.
3.Inspected by the Inspection Institution of ISO CE Certification.
4.100% QC inspection Before Shipmeng.
5.Best Quality & Best Service with Competitive price