Product Description
High Quality Trommel Screen Gold Trommel Plant Price List
Alluvial Gold treatment plant
Gravity separation also called gravity concentration, which is a mineral processing method for separating minerals according to different mineral densities.
The first stage in alluvial gold mining is to take the dredged river bed material and separate the small sand faction from the larger mineral fraction.
In a typical alluvial mining process physical separation methods such as screening and gravity separation are employed to separate the gold from the mineral fraction.
For alluvial gold ore, we do not need to crush and grind the ore. The general processing flow is usually:
1st. Screening and washing (trommel screen). We always use the trommel screen to wash the raw ore and remove the barren rocks and gravels.
2nd. Enriching (Gravity separation equipment). The gravity separation equipment such as the centrifugal concentrator, spiral chute, jig machine, are always applied at this process to enrich the heavy minerals.
3rd. Roughing, scavenging, and cleaning. We usually apply the shaking table for concentration after the 2nd step.
4th. Refinery. We could use the gold melting furnace to smelt the gold sand into shape lastly.
1.Product Application
YTS trommel screen is applied to materials classification and ore washing operation. The equipment has the advantages of simple installation and maintenance, easy operation, small installation slope, un-easy blocking, small space, low noise, low dust pollution, stable operation and high screening efficiency.
2.Working Principle
Trommel screen provides a simple, efficient and economical solution to upgrade a wide range of material and optimize the subsequent process steps of recovery. This method of screening helps to reduce operating and investment cost and to increase product quality, while allowing rapid and large volume processing.
Trommel screens are constructed of high quality material, designed for high performance, high production rates, lower operating costs and lower maintenance.
This material is then passed on to the downstream process equipment which can be in various forms such as centrifugal Concentrator, spirals, jigs etc.
After the materials are fed into the drum, the materials are classified, while the bigger materials flow forward along the inclination of drum and was classified through different mesh screens gradually. Classified small materials fell into respective bunker, and are delivered into finished product stack through manpower or belt conveyor.
3.Main Features of Rock trommel screen washer for solid waste separation
(1). High vibrating force with unique eccentric structure. Adopt advanced construction, making the vibrating force powerful.
(2). The beam and case of the screen are connected with high strength bolts without welding.
(3). Simple structure, easy to repair.
(4). Adopt tire coupling and soft connection makes operation smooth.
(5). High efficiency, easy maintenance, sturdy and durable.
4.Our service of Rock trommel screen washer for solid waste separation
1) Installation and guidance
When the machine arrives at your company, we will dispatch our technicians to your company to guide the installation and commissioning at site. User should pay for the following fees air tickets, boarding and lodging and traffic in client's factory.
(2)Technical training
We provide free technical training service to your stuff. Training content contains the main work principle of machine, operating regulations, maintenance methods and steps, safety, etc.
(3)Warranty:
Three guarantees of our product quality, warranty for one year (not include man-made damaged). We will maintain the machine for free for the quality problem. If the damage is caused by your improperly operation, the cost of the maintenance burden by you. we also provide you the life-long follow-up service.
5.Technical parameter of Rock trommel screen washer for solid waste separation
Model |
Drum Size
(mm)
|
Feed Size(mm |
Screen Pore(mm) |
Capacity
(t/h) |
Rotary Speed(r/min) |
Power
(kw) |
Weight(t) |
YTS800×2000 |
Φ800×2000 |
≤10 |
1-10 |
10-15 |
20 |
1.5 |
1.6 |
YTS 1000×2400 |
Φ1000×2400 |
≤15 |
1-15 |
20-50 |
15-19 |
4 |
3.3 |
YTS 1200×3000 |
Φ1200×3000 |
≤20 |
1-15 |
50-100 |
13-18 |
5.5 |
4.3 |
YTS 1500×3000 |
Φ1500×3000 |
≤20 |
1-20 |
100-150 |
13-18 |
7.5 |
5.3 |
YTS 1500×4500 |
Φ1500×4500 |
≤20 |
1-20 |
100-200 |
13-18 |
7.5 |
6 |
YTS 1800×4800 |
Φ1800×4800 |
≤30 |
1-30 |
200-250 |
13-18 |
7.5 |
7.5 |
YTS 2000×4000 |
Φ2000×4000 |
≤50 |
1-50 |
200-300 |
13-16 |
11 |
9 |
6.Our copmany
Gongyi Hengchang Metallurgy Building Material Equipments plant is a professional manufacturer specializing in the production of mineral beneficiation equipments, sand and stone crushing equipments, briquetting equipments, coal preparation equipments, drying and calcining equipments, cement plant equipments and compound fertilizer equipments.
7. Buying Guides
To choose the appropriate model for you ,can you tell me:
(1) What's the raw materials(such as limestone) and its size(mm/inch)?
(2). What do you neeed ?a machine or a stone production line ?
(3). What's the required capacity(tons per hour)?
FAQ:
1 Are you a trading company or manufacturer? What is your main products?
We are a manufacturer, Our factory name is Gongyi Hengchang metallurgical building materials equipments plant. which has over 25 years of experience in this industry. Our Main products are Jaw crusher,Impact crusher,Cone crusher,Hammer crusher,Vibration feeder,Vibration screen,sand/stone washing machine,ball mill,flotation machine,Disc pelletizer, concentrator,Rotary dryer,Conveyor machine ,Briquette machine , Mixer ,Roller grinder and so on,We produce products divided into Stone prodution line and Sand-making productiong line,
Magnetic separating process ,Flotation separating process ,Gravity separating process ,Coal and mineral powder briguetting .
2 Can I visit your factory and clients' workshop? How to get to your factory?
Yes, welcome to visit our factory anytime, we can also arrange your visit in our China clients' workshop.
For getting to our factory, you can get a flight to Zhengzhou Airport. It just takes about 2 hour from Zhengzhou Airport to our factory by car.
3 What is your guarantee time and aftersale service?
--Our guarantee time is 1 years.
--EEach order machine we provide installation drawing and operation manual. If needed, engineers can be sent to your factory for installation and commissioning, training.
--Any problem in operation or others about machines, we will give solution in 12-24hours.
4 What is your payment term?
We can accept various payment terms if it is convenient for you.
5 What is your delivery time?
machine leadtime is 7 working days in standard specification, 15~20 working days if customized.
Please tell your questions,Hengchang factory team are happy to serve&ready to be your business partner! If you want to know more details, please contact Winni ! Your satisfaction is our greatest pursuit.